top of page
  • Writer's pictureChristine Rhode-Parsons

What is The Schedule for My Pool Renovation Project?

Updated: May 31, 2020



"We were at the beginning stages of working with a recent customer. However, they did not quite understand the sequence of events, for a pool renovation project. Therefore we thought this may be a good idea to update our readers with this information as well."


QUESTION:

Hi Christie,

I'm planning on repairing and redoing the Pool Deck also, and may do this first, since it will create a mess, which I would prefer not to have after the Pool is renovated.


ANSWER:

You will definitely want to do the pool with the deck at the same time.

The schedule should be in this order:

  1. Skimmer Repair

  2. Coping Installation

  3. Waterline Tile Installation

  4. Deck Installation (Material, Pattern)

  5. Staples (Torque Locks) Repair

  6. Resurfacing

*This project had special concerns i.e.; cracks in the pool walls and a broken skimmer.


Christie's specializes in Swimming Pool & Backyard Renovations. You have pictured it in your head. You have sat on your lanai in summer’s heat and dreamed about the relaxing pool and the living spaces that would surround it. Not only are we experts at renovating swimming pools and spa's, we also can help build structures and amenities that will complete your backyard escape.


Give us a call at (239) 440-1241, to set up an on-site appointment.

433 views1 comment

Recent Posts

See All
bottom of page